Two Roll Rubber Mixing Machine

- Dec 05, 2017 -

Basic Info

  • Model NO.: XK160

  • Control Type: PLC

  • Power Source: Electric

  • Moter Power: 5.5kw

  • Gearbox: Hard Tooth Surface Reducer

  • Relay Brand: Schneider

  • Transport Package: Wooden Case + Steel Frame

  • Origin: China

  • Warranty: 5 Years

  • Automatic Grade: Semi-Automatic

  • Type: Open Mixing Mill

  • Roller Materials: Chilled Alloy Cast Iron

  • Moter Brand: Siemens

  • Trademark: XINCHENG

  • Specification: XK-160

  • HS Code: 8477800000

Product Description

Product Description
Production Name: Mini Two Roll Laboratory Testing Mixing Mill 
Model: XK-160
Application:The laborarory machines are an essential piece of equipment in the rubber and plastic processing industries.It plays an important tole in product quality control. The unit is ideal for experimentions with products during research and development, product improvement and color mixing thereby reducing production error to a minimum and saving production costs. This spelicallly designed laboratory machines from compact construction,low noise and safety. in addition,the machine is available to fir with a temperatute controller to ensure maximum temperature uniformity on the roller surface. 

Salient Features

  1. Electric heating system, even temperature spread along the roll

  2. Chrome plated surface, no split-off

  3. Adjustable gap, variable sampling thickness

  4. Revers jog rotating

  5. If dual inverter & motor is equipped, the two roll mill can has any speed ratio for different mixing purposes

  6. High precision PID temperature controller with PLC control

  7. Protection cover on roller top

  8. Emergency safety switch at knee level

  9. Emergence locking switch on control panel

  10. Touch screen graphic user interface

  11. Variable speed control with frequency inverter

  12. Optional the same speed of the two rolls

  13. Optional oil heating system


 

Key Specification

Roll hardness  HRC 55~60
Roll diameter  Φ160mm
Roll length   320mm
Roll linear speed 0~20m.p.m       
Roll speed   0~40rpm
Gap adjusting devicemanual, 0.1~6mm
Feeding quantity    1~2kg
Reducer    gear reducer
Safety device     touch type of emergency stop
Electric power request  3ph~380V, 26A

 
               

Two roll millPlastics experimentRubbers experiment
Speed ratio (front roll: back roll)1.25:11.35:1
Motor power1.5kw5.5kw
Heating or coolingElectric heating, 7kwWater cooling
Working temperatureRoom temperature~300°CRoom temperature
Temperature accuracy             ±3.5°C 
Dimensions(L×W×H)1000×550×1250mm1100×600×1250mm
WeightApprox. 600kgApprox. 650kg

 


 Services Commitment 
1. Our engineers can design target machines for you and send the drawing to confirm.
2. In the process of production, we will take photos and send to customers for you tracking.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas technical support
6.Test Machine Before Delivery, you only need to connect the wires to the outside the control cabinet. 
 
FAQ 
1. Delivery time of the rubber machines? 
 This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee? 
 Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
 Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered? 
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
 The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?  
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport.
We will pick up you at the airport.